Construction and Installation - Building Your Pool in Just 60 Days

We know how exciting it is to see your dream pool take shape. After your design is approved and permits are secured, we move into Step 4: Construction and Installation—the phase where your backyard truly begins its transformation.

Our experienced team specializes in gunite pools and is committed to delivering high-quality craftsmanship while staying on schedule. In fact, our goal is to complete your pool construction within 60 days from the start of construction.

Here’s what happens during this phase:

yard prep for excavation

The Pool Construction Timeline

1. Excavation

Construction begins with excavation. Using the approved 3D design as our guide, we carefully dig out the shape of your pool. This step requires precision to ensure:

  • Correct depth and shape

  • Proper grading for drainage

  • Safe handling around utility lines (already identified in site prep)

Excavation usually takes 1-3 days, depending on your yard’s size and soil conditions.

2. Steel Reinforcement

Next, we install a steel rebar framework. This acts as the skeleton of your pool, providing strength and durability. For gunite pools, this framework is crucial to handle the pressure of water and soil.

We shape the rebar precisely, following your pool’s curves and features, such as tanning ledges, spas, or benches.

pool steel reinforcement

3. Plumbing and Electrical Work

Before applying the gunite, we install:

  • Plumbing lines for circulation, filtration, and water features

  • Electrical systems for lighting, pumps, and automation

Our licensed professionals ensure everything meets North Texas building codes and passes inspections.

4. Gunite Application

This is the defining step of the pool’s structure. Gunite, a concrete mixture, is sprayed over the steel framework to form the pool shell. The advantages of gunite include:

  • Superior strength and longevity

  • Customizable shapes and depths

  • A solid, seamless structure

After application, the gunite cures for 7-10 days, allowing it to harden properly before moving to the next phase.

5. Tile, Coping, and Decking Installation

Once the gunite cures, we start adding the finishing touches to the pool structure:

  • Tile and coping are installed around the pool’s edge for function and style.

  • Decking—whether concrete, pavers, or natural stone—creates the surrounding space for lounging or entertaining.

This step is where your outdoor space really starts to come together visually.

6. Interior Finish Application

The final layer inside your pool is the interior finish, which can be plaster, pebble, or another material of your choice. This gives your pool its texture and color, while also making the surface smooth and waterproof.

new pool build

7. Filling and Equipment Setup

Once the finish is applied, we fill your pool with water and begin setting up and testing all the equipment:

  • Pumps and filters

  • Water features (e.g., waterfalls, jets)

  • Lighting systems

  • Automation controls

We ensure everything runs smoothly and meets local safety standards.

Staying on Schedule - Our 60-Day Commitment

At Signature Outdoor Design, we understand that time matters. While weather and other factors can influence timelines, our goal is to complete construction within 60 days from the start of excavation.

Our team works efficiently while maintaining high standards, communicating with you every step of the way to ensure:

  • No surprises

  • Clear updates on progress

  • A smooth transition to the final step: finishing touches and pool school where we teach you the in and outs of your new pool

Frequently Asked Questions About Pool Construction

How long does the entire construction process take?

Our goal is to complete your pool within 60 days from the start of excavation. Some complex projects or weather delays may extend the timeline, but we prioritize efficiency without compromising quality.

Can I make changes once construction starts?

Minor adjustments (like tile or coping selections) may be possible early in the process, but structural changes are difficult once excavation and gunite application begin. The 3D design phase is the best time for major modifications.

Will construction disrupt my yard?

There will be some disruption during excavation and heavy equipment use, but our team takes great care to minimize the impact on your property. We always communicate about access routes and restore the area after completion.

What if there’s bad weather during construction?

North Texas weather can be unpredictable, but we build in contingency plans. If rain or storms delay work, we’ll communicate any timeline adjustments and resume as soon as conditions allow.

Is gunite better than fiberglass or vinyl pools?

Gunite pools offer superior strength, customization, and longevity compared to fiberglass or vinyl options. They’re ideal for homeowners who want unique shapes, features, and a pool built to last for decades.

Ready to See Your Pool Come to Life?

When you choose Signature Outdoor Design, you’re working with a team that’s committed to quality craftsmanship, clear communication, and timely project completion. Our 60-day construction timeline helps get you swimming faster, without sacrificing quality.

Serving Frisco, Prosper, Celina, McKinney, and other North Texas communities, we specialize in building custom gunite pools that fit your lifestyle.